How To Do A Fish Cage Assembly?
Home » News » Aquaculture Fish Cage » How To Do A Fish Cage Assembly?

How To Do A Fish Cage Assembly?

Views: 20     Author: Site Editor     Publish Time: 2025-09-22      Origin: Site

1. PIPE WELDING

Use Butt fusion welding machine, welding all the pipes into lines.

HDPE Pipe welding


2. ASSEMBLY

(1) Insert the brackets into welded pipes, use two forklifts to take turns lifting the pipes. Make sure the gaps are even between brackets.

(2) Mark the center of pipe, take 4 safety belts, tie one belt 3m away from the center, the other belt on the other side, tie 1 each on both end of the pipes, take 2 chain hoists, hoop them on the center 2 belts, then cross two chain hoists.

(3) Place assisting pipes underneath the welded pipes line assisting pipes into a semicircle, the arch should point toward the direction going to bend, park forklifts at both ends, heads toward the bending direction, one worker pulling from the front both teams from both ends, head toward the center at the same time, hoop the belts on both ends to the chain hoist at the center, keep shortening the belts until the pipe is close the shape of zero.

(4) Adjust the pipe until the opening can touch each other. Place the welding machine in the inner circle. Place welding point at the clamp center. Keep adjusting until both ends fit in the clamp. Belt in the middle should be a cross. Tow sides of the pipes, should be straight lines before welding. Follow same welding rules, however keep the pressure for 2 hours. Weld the outer circle after releasing the inner circle pipe(4 hours in total). Take off the belts after loop is welded and completely cool down(after 4 hours). Push the brackets into position.

fish cage assembly

3. SHAPING

Spread paint at the center of circle. From the center, measure the radius, and mark 8 directions on of the circle. Use forklift to push/pull the pipes, until it reaches a circle. The pipe should be at the position of the mark.


4. INSTALL HANDRAIL

Insert the T-bar onto the bracket. Hammer the bolts into the preserved holes on brackets. Mark the blockers position, it should be 1cm away from the bracket. Avoid the preserved holes, while marking the blocker on inner circle. Keep pressure for 4-5 minutes after welding, until the stopper is hard and cool down. Follow same instruction for inner circle stopper.

upright pipe for fish cage

GET IN TOUCH
If you would like to have a question then get in touch today, 
we are ready to assist 24/7.
We welcome your cooperation and we will develop with you.
Product Inquiry

Efficient   .   Sustainable   .   Innovative

Waysail specializes in sustainable and environmentally marine and aquaculture solutions, based on many years of experience in the supply and installation of all types of mooring systems, from aquaculture farms to single boat moorings.

Aquaculture Mooring

Fish Cages & Net

Rigging Hardware

Copyright  2007 - 2025 Qingdao Waysail Ocean Technology Co., Ltd
We use cookies to enable all functionalities for best performance during your visit and to improve our services by giving us some insight into how the website is being used. Continued use of our website without having changed your browser settings confirms your acceptance of these cookies. For details please see our privacy policy.
×